Atelier Designa — Selected Work
Selected Work

Projects that shape how buildings are made.

2025 International Competition

Nairobi University
International Design Competition

Nairobi, Kenya

Massing, masterplanning, envelope strategy and early-stage sustainability studies.

Atelier Designa, in collaboration with Symbion

2018–2021 Stadium

Kai Tak Sports Park
Main Stadium

Hong Kong · ≈ 50,000 seats · AUD $2bn

Envelope and roof geometry development; computational design leadership across the full stadium envelope.

Delivered as part of the Populous project team

View Case Study →
2016–2017 Olympic Venue

National Speed Skating Oval
Beijing 2022

Beijing, China · Winter Olympic Games

Envelope geometry development and façade coordination; computational design leadership.

Delivered as part of the Populous project team

2016–2017 Stadium Refurbishment

Bukit Jalil National Stadium
+ Axiata Arena

Kuala Lumpur · Asian Games

Computational design development and geometry coordination across both venues.

Delivered as part of the Populous project team

2022 Hospitality

300-Room Hotel
Development Application

Australia

Massing, planning, and envelope strategy developed through design-intent 3D modelling.

Atelier Designa, in collaboration with Studio Workshop

2023 Residential

Mixed-Use Multiresidential
Development Application

Australia

Planning and envelope strategy developed through design-intent 3D modelling for a mixed-use residential development.

Atelier Designa, in collaboration with Studio Workshop

2023 Masterplan

Masterplan & Boardwalk
Concept Design

Australia

Massing, masterplanning, envelope strategy and early-stage sustainability studies.

Atelier Designa, in collaboration with Studio Workshop

2013 Environmental Design

Eco Jade Park

Taichung, Taiwan

Climate-driven envelope and environmental design studies. Early-stage architectural contribution.

Delivered within the Philippe Rahm Architectes team